The PHSR Process: Step-by-Step Guide to a Pre-Start Health and Safety Review in Ontario
What Is the PHSR Process?
Contact Us
How Long Does a PHSR Take?
A relatively straightforward project may be completed quickly, while a complex industrial installation can require considerably more time. Factors that can affect the timeline include:
- Equipment complexity
- Number of machines involved
- Size of the installation
- Availability of documentation
- Whether the equipment is already installed
- Number and type of deficiencies
- Required corrective actions
- Availability of contractors or equipment suppliers
- Need for additional engineering
- Project commissioning schedule
The PHSR Process at a Glance
Initial Consultation
Site Assessment and Information Gathering
Engineering Analysis and Review
Reporting, Recommendations and Ongoing Consulting
Final Compliance
Let’s look at each stage in more detail.
During the initial consultation, the engineering team gathers information about the project and determines the likely scope of the review.
This can include questions such as:
- What equipment is being installed?
- Is the equipment new or modified?
- Where will it be installed?
- What process will it perform?
- What materials will be handled?
- Has the equipment been installed already?
- When does the equipment need to be commissioned?
- Are there existing engineering drawings or documentation?
- Has a previous PHSR been completed?
- Are there known safety or compliance concerns?
What should you provide to the engineer?
Depending on the project, useful information may include:- Equipment specifications
- Manufacturer documentation
- Equipment drawings
- Layout drawings
- Electrical schematics
- Control-system information
- Guarding details
- Process descriptions
- Installation information
- Previous inspection or engineering reports
- Previous PHSRs
- Information about hazardous or combustible materials
A site assessment allows the engineer to evaluate the equipment in the environment where it will actually operate.
This is important because compliance cannot always be determined from manufacturer documentation alone.
The engineer may need to examine:
- Equipment installation
- Machine guarding
- Safety devices
- Emergency stops
- Control systems
- Electrical components
- Access points
- Operator areas
- Material handling
- Connections to other equipment
- Process conditions
- Surrounding equipment
- Workplace layout
- Potential hazards
For example, a machine may appear compliant when considered by itself, but its connection to another machine, conveyor, automated system, or process may introduce additional hazards.
Why the site assessment matters
A PHSR is intended to evaluate the equipment and process in the context of the workplace.That makes the site assessment an important part of understanding how the system actually operates—not just how it was designed to operate on paper.
For projects that are still being designed or installed, engineering documentation may also be reviewed before the site visit to identify potential issues early.
This is the stage where the equipment, installation, process, and applicable requirements are evaluated in detail.
The review may consider relevant requirements under Ontario occupational health and safety legislation as well as applicable engineering and safety standards.
Depending on the project, this can involve reviewing:
- Safeguarding
- Safety controls
- Electrical systems
- Mechanical hazards
- Access and egress
- Emergency-stop systems
- Lockout considerations
- Hazardous substances
- Combustible materials
- Fire and explosion hazards
- Equipment integration
- Process-specific risks
- Applicable CSA standards
- Applicable ANSI standards
- Other relevant technical requirements
PHSRs Are Not One-Size-Fits-All
A common misconception is that every PHSR follows an identical checklist.In reality, the engineering review needs to reflect the equipment and hazards involved.
For example, a PHSR involving a conventional piece of production equipment may focus heavily on machine guarding and controls.
A PHSR involving a dust collection system may require additional consideration of combustible dust hazards, system design, equipment integration, and explosion protection.
Similarly, a process involving flammable materials may involve different technical considerations from a conventional machine installation.
The goal is to identify the requirements relevant to the actual installation.
The report is an important part of the process because it provides a written record of the engineering assessment and identifies issues that need to be addressed.
Depending on the project, the report may document:
- Equipment reviewed
- Scope of the assessment
- Applicable requirements
- Standards considered
- Observations
- Identified deficiencies
- Required corrective actions
- Recommendations
- Supporting engineering information
The Goal Is a Clean PHSR Report
The ultimate objective is not simply to produce a report containing a list of problems.The objective is to work through the assessment and corrective actions so that the equipment can achieve the required level of compliance.
This is why reporting, recommendations, and follow-up are closely connected parts of the PHSR process.
These issues can range from relatively straightforward corrections to more substantial engineering or equipment modifications.
Examples might include:
- Missing or inadequate guarding
- Safety-control issues
- Inadequate emergency-stop arrangements
- Access concerns
- Electrical deficiencies
- Inadequate safety devices
- Issues with equipment integration
- Documentation gaps
- Process-specific hazards
In some cases, the equipment supplier or installation contractor may be able to make the correction.
In other cases, additional engineering, design, fabrication, controls work, or consultation may be required.
What Happens If Deficiencies Are Found?
Finding deficiencies does not mean the PHSR process has failed.Identifying problems before startup is one of the reasons the review is performed.
The engineering team can communicate the findings to the employer and other project stakeholders, explain what needs to be addressed, and provide appropriate recommendations or ongoing consulting support.
The equipment can then be reassessed as necessary once corrective measures have been completed.
Complex industrial projects may require communication between the engineer, employer, equipment supplier, contractors, controls specialists, and other parties.
Ongoing consulting can help resolve questions that arise during the correction process.
For example, a project may require clarification about:
- How a guarding issue should be corrected
- Whether a proposed modification addresses a deficiency
- Whether a control-system change is adequate
- How equipment should be integrated
- What additional documentation is required
- Whether a completed correction should be reassessed
The objective is to reach final compliance based on the scope of the review.
Depending on the project, this may involve:
- Completing corrective actions.
- Providing additional documentation.
- Reassessing modified equipment.
- Confirming that identified deficiencies have been addressed.
- Finalizing the engineering report.
- Completing the applicable professional engineering documentation.
The important point is that the PHSR process should not be viewed as complete simply because an initial inspection has occurred. Where deficiencies are identified, they need to be appropriately addressed and documented.
When Should You Start a PHSR?
Can a PHSR Be Completed After Installation?
What Happens After the PHSR?
It is also important to recognize that future modifications may change the compliance picture.
- Modified
- Relocated
- Automated
- Integrated with other equipment
- Connected to a new process
- Changed to handle different materials
Contact Us
How to Prepare for a PHSR
- 1Identify the equipment being reviewed.
- 2Gather manufacturer documentation.
- 3Provide available drawings and schematics.
- 4Identify the intended operating process
- 5Explain any modifications that have been made.
- 6Provide previous PHSRs if available.
- 7Identify known safety concerns.
- 8Make the equipment accessible for assessment.
- 9Identify the project commissioning timeline.
PHSR Process for Different Types of Equipment
Machinery and Automated Equipment
Reviews may focus on guarding, safety controls, emergency stops, operator access, and integration with other machinery.
Conveyors and Material-Handling Systems
The review may consider guarding, access, nip points, emergency stops, interfaces with other equipment, and material-handling hazards.
Dust Collection Systems
Dust collection projects can involve additional considerations related to combustible dust, system design, equipment integration, and explosion protection.
Spray Booths and Flammable Processes
The review may involve considerations associated with flammable materials, ventilation, ignition sources, electrical equipment, and fire or explosion hazards.
Industrial Process Equipment
Mixers, processing systems, production machinery, and other industrial equipment may require a review tailored to the specific process and hazards.
FAQs About PHSR Process
What are the steps of a PHSR?
Who performs a PHSR?
Is a PHSR just an inspection?
What happens if the engineer finds deficiencies?
Does the equipment have to be running during a PHSR?
How long does a PHSR take?
Can a PHSR be started before equipment arrives?
What is the end goal of a PHSR?
Why Choose PHSR.com for Your PHSR?
- Practical engineering advice
- Regulatory expertise
- Clear reporting
- Responsive consulting
- A focus on final compliance
Need a PHSR?
If you already know a PHSR is required, contact PHSR.com with your project type, location, and contact information to discuss the next step.